CASE STUDY 01 · Government Procurement & Sustainment
Government Agency Drawing Package
Legacy 2D technical drawings · Spare parts and sustainment sourcing
01 / THE OUTCOME
Arcessio turned a decades-old drawing archive into a sourcing-ready dataset in a single day, telling the team exactly which parts were makeable, how and in what material, before a single engineer-hour was spent.
One run: ~1,100 drawings read, ~1,000 parts assessed
Manual equivalent with 5 experienced engineers, first-pass triage only
Engineer-hours displaced, at 45–60 minutes per drawing
The challenge
Roughly 1,100 government 2D drawings needed manufacturability review before anything could be sourced. First-pass triage at that volume is measured in engineer-months, not days.
The solution
Arcessio read every drawing, extracting material, tolerances, finish and other critical requirements, then classified each part by viable manufacturing process and recommended a material.
Manufacturing intelligence used
- Manufacturability
- Process Selection
- BOM Analysis
- Should Cost
Ready to explore your parts?
Discover manufacturing opportunities in your drawings, CAD, and specifications.
Get started ↗
SELECTED FOR DEPARTMENT OF WAR SUSTAINMENT MODERNIZATION PROGRAM