Arcessio — Manufacturing Intelligence
← All case studies

CASE STUDY 01 · Government Procurement & Sustainment

Government Agency Drawing Package

Legacy 2D technical drawings · Spare parts and sustainment sourcing

THE OUTCOME

Arcessio turned a decades-old drawing archive into a sourcing-ready dataset in a single day, telling the team exactly which parts were makeable, how and in what material — before a single engineer-hour was spent.

12 hours

One run: ~1,100 drawings read, ~1,000 parts assessed

4–6 weeks

Manual equivalent with 5 experienced engineers, first-pass triage only

750–1,100

Engineer-hours displaced, at 45–60 minutes per drawing

The challenge

Roughly 1,100 government 2D drawings needed manufacturability review before anything could be sourced. First-pass triage at that volume is measured in engineer-months, not days.

The solution

Arcessio read every drawing, extracting material, tolerances, finish and other critical requirements, then classified each part by viable manufacturing process and recommended a material.

Manufacturing intelligence used

  • Manufacturability
  • Process Selection
  • BOM Analysis
  • Should Cost

Ready to explore your parts?

Discover manufacturing opportunities in your drawings, CAD, and specifications.

Get started ↗