Arcessio — Manufacturing Intelligence
← All case studies

CASE STUDY 02 · Industrial Tooling & Engineered Fastening

Fortune 500 Tools & Fastening Manufacturer

Global engineered fastening · Supplies automotive, aerospace and medical device OEMs

THE OUTCOME

Arcessio found the one part in a tooling BOM where a different process changed the economics, picked the material and the qualified supplier, and cut an 8-week cycle to 9 days at half the cost.

9 days

End-use metal production part delivered, against an 8-week lead time

~50%

Cost per part reduction, from $120 to $61 at 15 units per year

11 parts

Queued for the same treatment after the first part entered production

The challenge

Production-line tooling depends on highly customized parts made at low volume with complex geometry. Each design iteration ran eight weeks, with costs escalating across iterations.

The solution

An entire tooling BOM was screened in one pass. Analysis flagged a wire lifter in A2 tool steel for metal AM, matched it to maraging steel MS1, and routed it to a qualified service bureau.

Manufacturing intelligence used

  • BOM Analysis
  • Process Selection
  • Cost Analysis
  • Supplier Matching

Results achieved using the manufacturing intelligence technology that now powers Arcessio.

Ready to explore your parts?

Discover manufacturing opportunities in your drawings, CAD, and specifications.

Get started ↗