Blog · Nov 16, 2026
Rising Metal Prices: How Manufacturers Can Reduce Part Costs

Key takeaways
- How can manufacturers offset rising metal costs? Reduce material waste, choose a more economical manufacturing process, relax noncritical tolerances, consolidate assemblies and substitute materials where performance allows.
- How much have metal prices risen? US producer prices for cold rolled steel sheet rose 40.1% and copper wire and cable rose 25.5% from October 2025 to October 2026 (BLS). [2]
- Who should be involved? Procurement, engineering and suppliers together, since negotiating against an unchanged drawing leaves little room to save.
- How should savings be validated? Against an approved design, supplier-confirmed pricing and the full cost of implementation, including testing and customer approvals such as PPAP or FAI.
Manufacturers can offset rising metal costs by reducing material waste, choosing a more economical manufacturing process, reviewing unnecessary tolerances and simplifying assemblies. Material substitution can also help where performance requirements allow it. Each option needs engineering approval and supplier-confirmed economics. These are additional ways for procurement to reduce part costs when negotiating against an unchanged drawing leaves little room to save.
Consider the pressure at GM. On its October 20, 2026 earnings call, CFO Paul Jacobson said spot prices for hot rolled coil steel and copper were approximately 50% above the previous year’s average. GM expected about $2 billion in full-year cost headwinds from commodity inflation, logistics and DRAM memory combined. [1] For a procurement leader, numbers like these are a reason to bring engineering into the cost discussion.
The increase in metal prices
Figure 1. US producer price changes from October 2025 to October 2026
| Category | 12-month change |
|---|---|
| Cold rolled steel sheet and strip | 40.1% |
| Steel mill products | 32.9% |
| Copper wire and cable | 25.5% |
| Copper and brass mill shapes | 23.9% |
| Aluminum mill shapes | 23.3% |
Source: BLS October 2026 PPI Detailed Report, Table 7. Unadjusted 12-month changes; October data are preliminary. Labels are shortened. Full categories and codes appear in Table 2. [2]
The BLS figures measure specific US producer-price categories. They will not match every supplier’s price increase, and their comparison period differs from GM’s. But they give procurement teams a useful starting point for examining where higher input costs are affecting the parts they buy.
How can manufacturers offset rising metal costs?
Volkswagen’s Karsten Schnake makes this point clearly. In an August 31, 2026 interview, the Volkswagen brand’s Board Member for Procurement was asked where he saw the biggest savings opportunities. His answer: “Not at the end when we negotiate prices, but right at the beginning when we shape the product.” [3]
Volkswagen is putting that idea into practice through a Group-wide Corporate Cost Committee, bringing procurement, engineering, finance and sales together during the concept phase. Schnake also cautioned against simply shifting costs to suppliers. [3] That matters. A supplier under financial pressure can become a delivery problem, and a lower purchase price is of little use if production cannot get the parts it needs.
Ford faces commodity headwinds approaching $2.5 billion in its 2026 outlook. It is also changing how it builds vehicles. For its forthcoming Fathom electric truck, Ford reports replacing 146 structural parts with two large aluminum castings. Its October update describes testing and prototype work ahead of the 2027 launch. [4, 5] The example shows how much can change when engineers reconsider the assembly itself.
McKinsey’s September 2026 analysis identifies potential EV material-cost reductions of 10–25% through structural design changes. The opportunity varies with the vehicle and manufacturing strategy. [6] We cannot apply that percentage to an arbitrary parts portfolio, but the finding reinforces the case for looking closely at design decisions.
Can manufacturers reduce the cost of existing parts?
A new vehicle platform gives engineers a chance to start over. What happens to the parts a company has been buying for years? Those deserve a review as well. A design can continue to work perfectly while becoming unnecessarily expensive to manufacture.
Consider a housing designed for a production volume that has since changed. The original process may no longer be economical. A material chosen years ago may now cost substantially more, or a supplier may have equipment that can make the part with fewer operations. None of this means the original engineer made a bad decision. It means the conditions behind that decision need another look.
Procurement can identify where the money is going and which suppliers can help. Engineering can determine what can safely change. Give them the time and information to work through those questions together. Otherwise, the next sourcing exercise may produce another quote for exactly the same expensive design.
Four ways to reduce manufacturing costs
Start with the features and operations that make a part expensive. These four examples show what an engineering review can examine. Any savings will depend on the application and the cost of making the change.
| Design or process change | Potential economic benefit | Key checks |
|---|---|---|
| Match material to function | Lower mass or conversion cost | Loads, stiffness, fatigue, wear and corrosion |
| Change the production process | Less waste or machining time | Volume, tooling, properties and process capability |
| Relax noncritical tolerances | Less machining and inspection | Fit, function and tolerance stack-up |
| Consolidate an assembly | Fewer parts and assembly steps | Performance, repairability and qualification |
Table 1 Design and manufacturing options to evaluate
When does changing materials reduce part cost?
Changing materials reduces part cost when the finished, qualified component costs less to produce at the required volume and still meets its operating requirements. Does an entire housing need to be steel, or do only a few surfaces need its wear resistance? Engineers might consider an aluminum alloy with ribs and steel inserts. They would still need to establish stiffness, fatigue life and durability. Extra joining or corrosion protection could erase the benefit.
Can design for manufacturability reduce machining costs?
Design for manufacturability (DFM) can reduce machining costs by cutting material removal, setups and secondary operations while preserving required performance. A housing machined from billet may be a candidate for casting followed by finish machining. At low volume, tooling costs may make machining preferable. Compare material yield, cycle time and process capability at the actual production volume, then qualify the proposed process.
Question tolerances that add cost
A tight tolerance on a sealing surface may be essential. The same tolerance on a noncritical surface deserves a question: what function requires it? Engineering should check fit and tolerance stack-up before changing the drawing. Where the requirement can be relaxed, the supplier may be able to eliminate an operation, simplify inspection or reduce scrap.
Look at the assembly as a whole
A collection of brackets, fasteners and welded joints may offer opportunities for consolidation. Fewer components can mean less assembly work and fewer items to purchase and inspect. Check the consequences for tooling and repair as well. Ford’s casting example includes dimensional checks, X-ray inspection and material testing. [5] Simplifying the assembly still requires a thorough qualification process.
How can AI help identify part cost reduction opportunities?
AI can help screen drawings and CAD models for manufacturing alternatives and prioritize parts for engineering review. To make the findings useful, teams need to connect the design with purchase prices, demand and service requirements. Engineers and suppliers can then focus on the candidates that warrant investigation.
The Arcessio platform analyzes geometry, materials, tolerances and manufacturing economics to identify alternatives for review, according to the company. Engineering and supply-chain teams approve changes together and can source parts through its vetted supplier network. [7] Its tools for procurement teams connect the cost-reduction review with supplier sourcing.
A useful recommendation needs enough detail for an engineer and a supplier to assess it. What changes? What requirement must still be met? Where does the expected saving come from? If service loads or other essential information are missing, the team needs to obtain them before proceeding.
How should procurement validate estimated savings?
A CAD model alone cannot tell us whether a material substitution will survive the application. Engineers need to know the loads, fatigue duty, stiffness requirements, temperature, wear and corrosion conditions. They must determine what analysis and testing are needed. No cost estimate can substitute for that work.
Customer approvals also need to be part of the plan. For automotive parts, establish the applicable PPAP submissions and approvals. For aerospace parts, assess whether the change calls for partial or repeated first article inspection under the applicable 9102 requirements. These processes do not replace the engineering work needed to establish that the design is suitable. [8, 9]
Then ask suppliers to confirm that they can manufacture the revised part and quote it at the required volume. Include tooling, inspection, scrap, logistics and assembly, along with engineering, testing and transition costs. A lower unit price may not pay back the investment before the program ends.
Validate estimated savings against an approved design, supplier-confirmed pricing and the full cost of implementation. Then measure actual production and purchasing results against the agreed baseline. Keep the preliminary estimate, approved business case and realized saving separate so procurement can explain where each project stands.
Start with the parts that cost you the most
Choose a group of parts where spending is significant and there is enough remaining demand to justify a change. Bring the drawings, purchase history and functional requirements to engineering and the suppliers. Agree on which alternatives to evaluate and who will approve them.
We should expect procurement teams to negotiate well. We should also give them access to the engineering decisions that determine what they are negotiating over. That gives manufacturers more options when material prices rise.
Talk to Arcessio about reviewing your parts. Start with 10–20 parts and discuss their current cost, annual volume and functional requirements. Arrange file sharing with the team after your initial inquiry.
Supporting metal price data
| Category | Commodity code | 12 month change |
|---|---|---|
| Cold rolled steel sheet and strip | 101707 | 40.1% |
| Steel mill products | 1017 | 32.9% |
| Copper wire and cable | 10260314 | 25.5% |
| Copper and brass mill shapes | 102502 | 23.9% |
| Aluminum mill shapes | 102501 | 23.3% |
| Steel pipe and tube | 101706 | 21.7% |
| Aluminum die-castings | 10280207 | 16.8% |
| Nickel and nickel-base alloy mill shapes | 102504 | 10.5% |
| Titanium and titanium-base alloy mill shapes | 102505 | 0.6% |
Table 2 Selected US producer-price categories
Source: BLS October 2026 PPI Detailed Report, Table 7. October 2025 to October 2026; not seasonally adjusted. October observations are preliminary. Commodity codes combine the group and item codes shown in the report. [2]
Data and source notes
Figure 1 uses five categories from Table 2. The percentages are reported directly by BLS, rather than calculated from rounded index levels. Steel mill products includes narrower steel categories shown here, so the rows overlap and should not be added together.
Actual purchase prices depend on the grade, product form, geography, contract and purchase date. Finished-part prices also include manufacturing and other costs. The indexes provide market context; use the bill of materials and supplier quotations to evaluate a specific part.
GM and Ford’s cost outlooks cover different expense categories. Volkswagen’s interview describes its procurement approach, while Ford’s casting example concerns a vehicle still in development. McKinsey’s savings range is an EV research estimate, not an Arcessio performance claim. Arcessio’s capabilities are attributed to its own public description.
References
Sources checked on November 16, 2026. Numbers in the article correspond to the entries below.
[1] GM Q3 2026 earnings call, October 20, 2026. Paul Jacobson’s prepared remarks on commodity, logistics and DRAM headwinds. Transcript hosted by ROIC AI; a third-party transcription of the call. Open source
[2] US Bureau of Labor Statistics. October 2026 PPI Detailed Report, Table 7. Preliminary unadjusted 12-month changes. Open source
[3] Volkswagen Group. Karsten Schnake on the importance of transformation for Procurement. August 31, 2026. Open source
[4] Ford Motor Company. Form 10-Q for the quarter ended September 30, 2026. Outlook section, commodity headwinds approaching $2.5 billion. SEC filing. Open source
[5] Ford, Vladimir Bogachuk. Ford Produces More Than 5,000 Unicastings for Fathom Electric Truck – and Counting. October 28, 2026. Open source
[6] McKinsey. Building profitable EVs: Ten structural design moves to cut material costs. September 2026. See methodology and 10–25% material-cost opportunity. Open source
[7] Arcessio. About Arcessio. Company description of analysis, joint approval and sourcing workflow. Open source
[8] AIAG. Production Part Approval Process. Official overview of PPAP scope; detailed manual and customer-specific requirements govern application. Open source
[9] IAQG. 9102 Summary of Changes, Revision B to Revision C. July 11, 2023. Section 4.6 addresses change evaluation and partial or repeated FAI. Open source
GM’s official results release confirms the call date and links to the company’s earnings materials: GM Q3 2026 results
Ready to put these ideas to work?
Estimate what Arcessio could save your team, or contact us to get started with your parts.