RESOURCES
Research, perspectives, and real-world results from the team building the future of manufacturing.
6 resources
Review time, down from 4–6 weeks of manual triage
~1,100 legacy government drawings triaged for manufacturability in 12 hours instead of 4–6 weeks of engineering time.
Read the case study ↗Cost reduction per part
A wire lifter re-routed from an 8-week tooling cycle to metal additive: delivered in 9 days at half the cost per part.
Read the case study ↗Lead time reduction — spares in 3 days instead of 30
An overweight robotic jig re-made in SLS Nylon 12: spare parts in 3 days instead of 30, at $20 per part.
Read the case study ↗Qualified for metal additive production
25 candidate parts screened across tooling and fixtures; three qualified for metal AM and reached validated production in 8 months.
Read the case study ↗Cost reduction per quarter versus tooling
A quarterly 200-unit PEEK order costed against tooling and machining, saving $58.7K per quarter.
Read the case study ↗Cost reduction per assembly
Parts consolidation across high-mix sub-assemblies cut cost per assembly by 75% and simplified the BOM.
Read the case study ↗